Start conversation

Get in touch today!

Project 509 – Greenford Road

Project 509 - Greenford Road

Project Type:Chimney Breast Removal

Services Provided: Structural Engineering, Construction.

Location: Ealing

Status: Complete 2025.

Client Brief

The client approached us after receiving an unfeasible and overly complex design from another structural engineer. He needed a practical and cost-effective solution for removing four chimney breasts across two floors of his home.

Before
After
Our Solution
Scope of Works
Project Outcome

We attended the property the same day to assess the structure and proposed a revised design that was both structurally sound and buildable. We provided a clear quote covering both the design and construction aspects, which the client approved without hesitation.

  • Structural design and calculations for safe chimney breast removal

  • Liaison and coordination with building control

  • Safe removal and disposal of chimney breasts at ground and first floor

  • Supply and installation of steel beams

  • Final building control approval

The project was delivered on time and within budget, with minimal disruption to the client. All works met the structural and compliance standards required by building control, and the client was extremely satisfied with the result.

Looking for structural construction company in London?

At Sandstone Structures, we combine expert structural design, precise calculations, and professional building execution to deliver residential projects that are safe, efficient, and fully compliant. Whether you’re planning a home extension, loft conversion, or chimney removal, our team is here to guide you from concept to completion.

Recent Testimonials